案例详情
详情描述
本项目是信跃老客户厄瓜多尔石油公司OCP订购, 并最终用于原油输送。
项目于 2023 年 3 月份启动,历经 4 个月客户最终决定进行采购。此次订单产品为 1079 吨 高钢级 ERW, 难点在于所有生产要求高于标准。信跃生产部门克服生产难点,致力于提供优质产品给客户, 严格把控生产环节。在整个生产过程中,SGS 三方检验员全程在厂监造, 无论从原材料,成品管子的检验,防腐质量 还是资料审核,所有检测结果100%通过,于2023 年 11 月份整批货物踏上去厄瓜多尔。
This project was an order placed by Xinyue's long-term client, Ecuadorian oil company OCP, for crude oil transportation.
The project commenced in March 2023, and after four months, the client finally decided to proceed with the purchase. This order consisted of 1079 tons of high-strength ERW pipe, with the challenge lying in the fact that all production requirements exceeded standards. Xinyue's production department overcame these difficulties, committed to providing the client with high-quality products and strictly controlling every aspect of production. Throughout the entire production process, SGS third-party inspectors were on-site to supervise the manufacturing. From raw material and finished pipe inspections to corrosion protection quality and document review, all test results were 100% satisfactory. The entire shipment departed for Ecuador in November 2023.